The structural steel support members were designed to minimize penetrations in the soffit, whilst also allowing maximum flexibility and tolerance to simplify the installation
Out of hours installation was required due as it was a live environment
The complex methodology required to allow for a short installation window, integration with other contractors, and working at over 10m up in the air